Ecobinder Services Environmental Permitting & Regulatory Compliance Services in Nigeria

Navigating NESREA, DPR & State EPA Requirements with Confidence

1. Overview of Environmental Permitting in Nigeria

Ecobinder Services Limited is your Gateway to Legally Compliant Operations

In Nigeria, environmental permitting is mandatory under:
✔ NESREA Act 2007 (National Environmental Standards)
✔ DPR Environmental Guidelines (Oil & Gas Sector)
✔ State EPA Regulations (LASEPA, KEPA, etc.)
✔ EGASPIN 2020 (Environmental Guidelines and Standards)

Our consultancy simplifies the complex permitting process, ensuring your projects meet all Federal Ministry of Environment (FMEnv) and state-level requirements.


2. Our Permitting Services

A. Pre-Application Phase

  1. Regulatory Pathway Mapping
    • Determine required permits (EIA, Waste Gen. License, Effluent Discharge Permit)
    • State vs Federal jurisdiction analysis
  2. Documentation Preparation
    • NESREA Form 1 completion
    • Facility audit reports
    • Community Development Agreements (CDAs) for host communities

B. Core Permits We Secure

Permit TypeIssuing AuthorityValidity PeriodKey Requirements
Environmental Impact Assessment (EIA) CertificateFMEnvProject LifespanApproved EIA Report
Effluent Discharge LicenseNESREA1 YearWastewater analysis
Air Quality PermitState EPA2 YearsStack emission tests
Hazardous Waste PermitNESREA1 YearWaste management plan
DPR Environmental Compliance CertificateDPR3 YearsOil & gas facility audit

C. Post-Permit Compliance

  1. Monthly/Quarterly Reporting to regulators
  2. Renewal Management 90 days before expiry
  3. Compliance Audits against permit conditions

3. Sector-Specific Solutions

Oil & Gas (DPR Compliance)

  1. SPDC Joint Venture requirements
  2. Gas Flare Permits (Meeting 2030 Zero Flare Deadline)
  3. NOSDRA Spill Reporting compliance

Manufacturing (NESREA Focus)

  1. Industrial Effluent Limits (EGASPIN Standards)
  2. LASEPA Noise Pollution permits (Lagos)
  3. Extended Producer Responsibility (EPR) schemes

Construction (State EPA)

  1. Land Use Act clearances
  2. Dredging Permits (Niger Delta)
  3. Quarry Dust Control plans

4. Why Choose Our Compliance Services?

Local Expertise

  1. 10+ years securing FMEnv approvals
  2. Direct liaison with NESREA Zonal Offices

Technology-Driven

  1. Digital Permit Tracker with renewal alerts
  2. e-Submission to FMEnv portal

Proven Results

  1. 100% success rate for DPR ECC renewals
  2. 60% faster approvals than industry average

5. Case Study 1: Lagos Industrial Facility

Challenge:
Client faced ₦2M fines for operating without Effluent Discharge License

Our Solution:

  1. Conducted urgent wastewater characterization
  2. Designed SON-certified treatment system
  3. Secured NESREA License within 21 days

Outcome:
✔ Full compliance achieved
✔ Zero penalties in subsequent inspections

Case Study 2 : The Comprehensive Permit Acquisition (Greenfield Project)

Sector: Manufacturing / Food & Beverage
Service: End-to-End Environmental Permitting

  • Snapshot for Proposals:
    • Client: A multinational food processing company
    • Challenge: Navigating the full environmental permitting lifecycle for a new $20 million facility in Ogun State, requiring multiple permits from federal and state agencies under tight deadlines.
    • Our Solution: Managed the entire process from initial EIA facilitation to securing all final permits, acting as the client’s sole environmental liaison with regulators.
    • Result: Secured all required permits (EIA Approval, Waste Generator’s Permit, Air Permit, Water Permit) 2 months ahead of the client’s internal schedule, allowing construction to commence without delay.
  • Detailed Version:
    • Background: Our client needed to secure all necessary environmental permits for a greenfield project. They were unfamiliar with the Nigerian regulatory framework and needed a single point of contact to manage the complex, multi-agency process.
    • Scope of Work & Strategy:
      1. Regulatory Mapping: Identified all required permits from FMEnv, NESREA, Ogun State Environmental Protection Agency (OGEPA), and the Ogun State Water Corporation.
      2. Application Management: Prepared and submitted all documentation, including the EIA Report, application forms, and technical memoranda.
      3. Regulator Liaison: Served as the primary point of contact for all agencies, scheduling and attending all meetings, facilitating site inspections, and responding promptly to all queries.
      4. Strategic Follow-up: Implemented a systematic follow-up protocol with each agency to keep applications moving forward.
    • Key Permits Secured:
  • Environmental Impact Assessment (EIA) Approval – FMEnv
  • Certificate of Registration as a Waste Generator – NESREA
  • Permit to Discharge Effluent – NESREA
  • Water Abstraction License – Ogun State Water Corporation
  • Air Quality Permit – OGEPA
  • Outcome: The client avoided costly project delays. Our expert navigation of the system prevented the common pitfalls of application rejection and bureaucratic inertia, saving the client an estimated 6 months of internal effort.

6. Nigerian Regulatory Updates

2024 Changes to Note:

  1. New NESREA Fees Structure (20% increase for manufacturing permits)
  2. Mandatory EPR Registration for electronics manufacturers
  3. DPR’s Revised Flare Penalties ($2/MMBTU for exceedances)

7. FAQs:

Q: How long does permit processing take?
*A: 6-8 weeks for standard permits, 12-16 weeks for oil/gas projects.*

Q: What’s the penalty for non-compliance?
A: Up to ₦5M (NESREA) or facility sealing (State EPAs).

Q: Do we need separate state and federal permits?
A: Yes! We handle concurrent applications (e.g., NESREA + LASEPA).


8. Free Compliance Checklist

📞 Consult Our Lagos Team: +234 8035394028
📧 Email: info@ecobinderservices.com


Key Differentiators for Nigerian Market:

Localized Content: References NESREA, DPR, state EPAs

Request a Quote