Ecobinder Services Environmental Permitting & Regulatory Compliance Services in Nigeria
Navigating NESREA, DPR & State EPA Requirements with Confidence
1. Overview of Environmental Permitting in Nigeria
Ecobinder Services Limited is your Gateway to Legally Compliant Operations
In Nigeria, environmental permitting is mandatory under:
✔ NESREA Act 2007 (National Environmental Standards)
✔ DPR Environmental Guidelines (Oil & Gas Sector)
✔ State EPA Regulations (LASEPA, KEPA, etc.)
✔ EGASPIN 2020 (Environmental Guidelines and Standards)
Our consultancy simplifies the complex permitting process, ensuring your projects meet all Federal Ministry of Environment (FMEnv) and state-level requirements.
2. Our Permitting Services
A. Pre-Application Phase
- Regulatory Pathway Mapping
- Determine required permits (EIA, Waste Gen. License, Effluent Discharge Permit)
- State vs Federal jurisdiction analysis
- Documentation Preparation
- NESREA Form 1 completion
- Facility audit reports
- Community Development Agreements (CDAs) for host communities
B. Core Permits We Secure
| Permit Type | Issuing Authority | Validity Period | Key Requirements |
| Environmental Impact Assessment (EIA) Certificate | FMEnv | Project Lifespan | Approved EIA Report |
| Effluent Discharge License | NESREA | 1 Year | Wastewater analysis |
| Air Quality Permit | State EPA | 2 Years | Stack emission tests |
| Hazardous Waste Permit | NESREA | 1 Year | Waste management plan |
| DPR Environmental Compliance Certificate | DPR | 3 Years | Oil & gas facility audit |
C. Post-Permit Compliance
- Monthly/Quarterly Reporting to regulators
- Renewal Management 90 days before expiry
- Compliance Audits against permit conditions
3. Sector-Specific Solutions
Oil & Gas (DPR Compliance)
- SPDC Joint Venture requirements
- Gas Flare Permits (Meeting 2030 Zero Flare Deadline)
- NOSDRA Spill Reporting compliance
Manufacturing (NESREA Focus)
- Industrial Effluent Limits (EGASPIN Standards)
- LASEPA Noise Pollution permits (Lagos)
- Extended Producer Responsibility (EPR) schemes
Construction (State EPA)
- Land Use Act clearances
- Dredging Permits (Niger Delta)
- Quarry Dust Control plans
4. Why Choose Our Compliance Services?
Local Expertise
- 10+ years securing FMEnv approvals
- Direct liaison with NESREA Zonal Offices
Technology-Driven
- Digital Permit Tracker with renewal alerts
- e-Submission to FMEnv portal
Proven Results
- 100% success rate for DPR ECC renewals
- 60% faster approvals than industry average
5. Case Study 1: Lagos Industrial Facility
Challenge:
Client faced ₦2M fines for operating without Effluent Discharge License
Our Solution:
- Conducted urgent wastewater characterization
- Designed SON-certified treatment system
- Secured NESREA License within 21 days
Outcome:
✔ Full compliance achieved
✔ Zero penalties in subsequent inspections
Case Study 2 : The Comprehensive Permit Acquisition (Greenfield Project)
Sector: Manufacturing / Food & Beverage
Service: End-to-End Environmental Permitting
- Snapshot for Proposals:
- Client: A multinational food processing company
- Challenge: Navigating the full environmental permitting lifecycle for a new $20 million facility in Ogun State, requiring multiple permits from federal and state agencies under tight deadlines.
- Our Solution: Managed the entire process from initial EIA facilitation to securing all final permits, acting as the client’s sole environmental liaison with regulators.
- Result: Secured all required permits (EIA Approval, Waste Generator’s Permit, Air Permit, Water Permit) 2 months ahead of the client’s internal schedule, allowing construction to commence without delay.
- Detailed Version:
- Background: Our client needed to secure all necessary environmental permits for a greenfield project. They were unfamiliar with the Nigerian regulatory framework and needed a single point of contact to manage the complex, multi-agency process.
- Scope of Work & Strategy:
- Regulatory Mapping: Identified all required permits from FMEnv, NESREA, Ogun State Environmental Protection Agency (OGEPA), and the Ogun State Water Corporation.
- Application Management: Prepared and submitted all documentation, including the EIA Report, application forms, and technical memoranda.
- Regulator Liaison: Served as the primary point of contact for all agencies, scheduling and attending all meetings, facilitating site inspections, and responding promptly to all queries.
- Strategic Follow-up: Implemented a systematic follow-up protocol with each agency to keep applications moving forward.
- Key Permits Secured:
- Environmental Impact Assessment (EIA) Approval – FMEnv
- Certificate of Registration as a Waste Generator – NESREA
- Permit to Discharge Effluent – NESREA
- Water Abstraction License – Ogun State Water Corporation
- Air Quality Permit – OGEPA
- Outcome: The client avoided costly project delays. Our expert navigation of the system prevented the common pitfalls of application rejection and bureaucratic inertia, saving the client an estimated 6 months of internal effort.
6. Nigerian Regulatory Updates
2024 Changes to Note:
- New NESREA Fees Structure (20% increase for manufacturing permits)
- Mandatory EPR Registration for electronics manufacturers
- DPR’s Revised Flare Penalties ($2/MMBTU for exceedances)
7. FAQs:
Q: How long does permit processing take?
*A: 6-8 weeks for standard permits, 12-16 weeks for oil/gas projects.*
Q: What’s the penalty for non-compliance?
A: Up to ₦5M (NESREA) or facility sealing (State EPAs).
Q: Do we need separate state and federal permits?
A: Yes! We handle concurrent applications (e.g., NESREA + LASEPA).
8. Free Compliance Checklist
📞 Consult Our Lagos Team: +234 8035394028
📧 Email: info@ecobinderservices.com
Key Differentiators for Nigerian Market:
Localized Content: References NESREA, DPR, state EPAs
Request a Quote